Aircraft of the armed forces of the USSR and Russia. Aircraft of the armed forces of the ussr and russia combustion chamber vrdk

  • 07.03.2020

    How to buy a ticket without leaving home?

    Indicate the route, date of travel and number of passengers in the required fields. The system will select the option from the hundreds of airlines.

    From the list, select the flight that suits you.

    Enter personal data - they are required to issue tickets. Tutu.ru transmits them only via a secure channel.

    Pay for tickets with a credit card.

    What does an e-ticket look like and where can I get it?

    After paying on the site, a new entry will appear in the airline's database - this is your electronic ticket.

    Now all information about the flight will be stored by the carrier airline.

    Modern air tickets are not issued in paper form.

    You can see, print and take with you to the airport not the ticket itself, but the itinerary receipt. It has a number electronic ticket and all information about your flight.

    Tutu.ru sends an itinerary receipt by e-mail. We recommend to print it and take it with you to the airport.

    It can come in handy at passport control abroad, although you only need your passport to board the plane.

    How to return an e-ticket?

    The airline determines the rules for returning tickets. Usually, the cheaper the ticket, the less money you can get back.

    To return the ticket as soon as possible contact with the operator.

    To do this, you need to respond to the letter that you will receive after ordering tickets on the Tutu.ru website.

    Indicate in the subject of the message "Refund of tickets" and briefly describe your situation. Our specialists will contact you.

    The letter that you will receive after ordering will contain the contacts of the partner agency through which the ticket was issued. You can contact him directly.

Due to the underestimation of the development prospects by the military authorities, the attack jet aviation of the USSR by the mid-40s of the twentieth century began to lag behind its main competitors. Work aimed at creating new jet aircraft engines was also carried out in the 30s, but most of them were abandoned halfway through, before reaching the verification stages and installation on aircrafts. After the introduction of jet engines in the power plants of enemy aircraft Soviet Union resumed work on the improvement of their combat aircraft.

History of the Su-5

February 1944. At a scheduled meeting of the State Defense Committee, it was decided to create a center for jet engine building on the basis of the People's Commissariat of Aviation Industry (NKAP). The committee's plans were to receive the first draft samples of jet aircraft engines and aircraft in a month.

The design bureaus of S.A. received assignments for the development of aircraft with jet engines. Lavochkina, A.I. Mikoyan, N.N. Polikarpova and P.O. Sukhoi.

Pavel Osipovich's brigade was given two tasks at once:

  • 1) design and build an experimental single-seat version equipped with VK-107A and VRDK engines;
  • 2) to develop a project and build a modification of the Su-6, on which the RD-1 engine, developed by designer V.P. Glushko.

It was possible to complete the first task already at the beginning of 1944. Sukhoi presented a sketch of a fighter, which was equipped with an M-105A piston engine and an additional compressor air-jet engine.

The VRDK was driven by the transfer of torque from the M-105A engine shaft in a two-speed transmission.

This draft design received the designation "I-107" and was submitted for consideration by the State Defense Committee in July 1944.

The approval of the prototype project coincided with the completion of static tests. The release of the first flight prototype was delayed due to the violation of the terms of delivery of engines.

The aircraft received the index Su-5. For the first time it was lifted into the air by the test pilot of the Sukhovka plant G.N. Komarov. It happened on April 6, 1945. Factory tests lasted until October. 42 flights were made, 11 of which involved the inclusion of the VRDK.

The fighter did not live up to expectations, maximum speed was 20% less than expected. Therefore, it was decided to send the next copy for blowing in the wind tunnel T-101 TsAGI.

November 1946 Issue of a decree of the USSR government, which stops work on "irrelevant" aircraft projects. Su-5 fell into this category and in mass production never launched.

Su-5 design

The Su-5 fighter had a design like a single-seat metal monoplane, sheathed with sheet duralumin 1-2 mm thick.

The wings of the aircraft are single-spar, double-console. The junction of the console with the fuselage, which is removed under the fairing, runs along the side ribs.

The Su-5 package includes ailerons with aerodynamic and weight compensation. The controllable trim tab is on the left aileron.

It was planned to include the H-23 cannon with 100 rounds of ammunition into the armament of this fighter. The designers also planned to place two 12.7 mm UBS machine guns with 200 rounds of ammunition.

The cockpit was protected by armor 1 cm thick and armored glass.

The fuselage of the Su-5 monocoque type, made of duralumin. An air channel stretches along the fuselage, where a compressor, a water radiator and a spray chamber were placed in series. The tail part of the channel is filled with a combustion chamber, which is made of heat-resistant steel and has a double wall through which air passes for the purpose of cooling.

The oil cooler is located in the tunnel of the left wing console. The gas tanks that fuel the main engine and the VRDK are located in the forward part of the fuselage behind the cockpit.

A metal non-adjustable cantilever stabilizer and fin are located above the fuselage. The steering is equipped with metal controlled trimmers.

Landing gear Su-5 retractable type. When assembled, the landing gear is closed with flaps. The crutch wheel in flight mode is under the combustion chamber.

The upper part of the fighter was painted green, the lower part - light blue.

Su-5 characteristics:

Modification
Wingspan, m 10.56
Length, m 8.51
Height, m 2.97
Wing area, m2 17.00
Weight, kg
empty plane 2954
maximum takeoff 3604
engine's type 1 PD VK-107A + VRDK
Power, hp 1 x 1650
Maximum speed, km/h 830
Cruise speed, km/h 640
Practical range, km 600
Climbing capacity, m/min 880
Practical ceiling, m 12000
Crew, people 1
Armament: one 23 mm NS-23 gun (100 rounds) and
two 12.7 mm UBS machine guns (400 rounds)

In January 1944, in the design bureau of plant No. 289, on an initiative basis, they began to sketch design of a single-seat fighter with a combined power plant designed by A.A. Fadeev and K.V. Kholshchevnikov. By mid-February, the 1st version of the project was ready. The aircraft, according to the scheme, was a cantilever monoplane, all-metal construction with a single-fin tail and retractable landing gear in flight.

The first version of the fighter with VRDK. Drawing.

The combined power plant consisted of the main M-107A piston engine with a propeller and an additional VRDK, which served as an accelerator. The compressor was driven by the M-107A engine using two shafts and an intermediate gearbox. The air intake for the VRDK was carried out by two air intakes located in the toes of the wing center section. The air channels ran inside the center section, then entered the fuselage and combined into one common channel, which supplied air to the axial single-stage compressor, then the compressed air entered the front of the combustion chamber with nozzles installed in it. The rear of the combustion chamber passed into an unregulated jet nozzle.

At the beginning of March 1944, a preliminary design of the 2nd version of a single-seat fighter with the M-107A and the Fadeev-Kholshchevnikov air-breathing missile system was completed. This project had a number of significant differences from the previous version. Given that the wing air intakes have significant total pressure losses associated with a large number of bends in the air channels, as well as with increased flow rates due to the small size of the flow sections, in the second variant it was decided to place the air intake under the propeller spinner of the M-107A engine, in connection with which the layout of the aircraft has changed. In addition, the changes affected the location of the oil cooler and the radiator of the M-107A cooling system, and the transmission of the VRDK compressor drive was simplified. The project had a number of other differences.

Upon completion of the design, the 2nd option was sent for review to the NKAP of the USSR and there it was included in the draft plan for the pilot construction of aircraft of the KA Air Force for 1944.

The second version of the fighter with VRDK. Drawing.

Earlier, in February 1944, the State Defense Committee (GKO) decided to organize NII-1, which would concentrate all research and practical work reactive technology. In addition, this decree obliged the NKAP of the USSR to submit proposals for the creation of specific models of aircraft and jet engines within a month.

In March, a draft government decree was prepared, which, along with the aircraft of other design bureaus, included the aforementioned P.O. Sukhoi fighter. On May 22, 1944, the GKO adopted a resolution that served as the beginning of a new stage in the development jet technology in Soviet Union. This resolution and the order of the NKAP of the USSR No. 371 dated May 30, 1944 obliged the Chief Designers A.S. Yakovlev, S.A. Lavochkin, N.N. Polikarpov, A.I. Mikoyan, M.I. Gurevich and P.O. Dry to begin work on the creation of aircraft with jet engines.

P.O. Sukhoi received the task: “To design and build a single-seat experimental aircraft with a VK-107A engine with the installation of an additional VRDK designed and built by CIAM, with the following flight data:
Maximum speed with the inclusion of the VRDK at an estimated altitude of 7000-8000 m for 10 minutes: 800 km / h
Maximum speed without turning on the VRDK: 700 km / h
Climb at 5000 m without turning on the VRDK: 5.5 min
Climb at 5000 m with the inclusion of VRDK: 4.3 min.
The duration of the flight, subject to the use of afterburner, is no more than 10 minutes.
(activation of VRDK): 1h. 30 minutes
Practical ceiling: 11800 m
Takeoff run: 330 m
On the aircraft, provide for the installation of one cannon of 20 mm or 23 mm caliber and 2 machine guns of 12.7 mm caliber.
Build the aircraft in 2 copies and submit for flight tests:
1st copy - February 15, 1945
2nd copy - March 15, 1945"

In early June, the design bureau began designing the aircraft, which initially received the designation I-107, or "D", and already in the process of factory flight tests - the Su-5. The 2nd version of the draft design of a single-seat fighter with the M-107A and the TsIAM air defense missile system was taken as the basis, which, after completion, was submitted for consideration to the leadership of the USSR NKAP and the Air Force of the Spacecraft.

In parallel with the preliminary design, work was carried out on technical project and layout building. In order to meet the deadlines set by the government, in July, even before the full production of the drawings, they began to build a copy of the aircraft for static tests. In mid-September, a meeting of the joint mock-up commission was held, which made a number of comments on the cabin equipment, on the VMG and VRDK, on ​​armament and a number of other systems. Design changes related to the comments were urgently made to the prototype aircraft under construction. Conclusion on draft design was approved by the leadership of the NKAP of the USSR - on September 19, the chief engineer of the Air Force of the spacecraft - on October 6, and the protocol of the mock-up commission - on October 24, 1944.

Su-5 fighter model.

On November 23, the construction was completed and a copy of the aircraft was transferred to TsAGI for static tests. The construction of the flight prototype was delayed due to the untimely supply of the power plant, and only on March 24, 1945, the aircraft was transferred to the flight test station (LIS) of plant No. 134. On the same day, test pilot G.I. Komarov completed the first taxiing, and On April 6, after obtaining permission, the first flight of an experimental Su-5 fighter took place. Factory flight tests have begun.

Aircraft tests were carried out at the Tushino airfield, but on June 15 they stopped due to an accident with the VK-107A engine. By this time, 23 flights had been completed with a total flying time of 8 hours 50 minutes. Based on their results, a report was drawn up, which stated:
“... 1. The propeller unit in terms of power, lubrication and cooling works quite satisfactorily in all modes.
2. The controllability and stability of the aircraft at various speeds and evolutions is normal.
3. During the flight at supermaximum speed, no stall elements and vibrations were observed.
4. The obtained maximum speed at an altitude of H=4350 m is 793 km/h. During further flights, it was not possible to confirm the speed received once ... ", which was explained by the lack of knowledge of the VRDK.

During the period of forced downtime due to the lack of an engine, a new wing with a laminarized TsAGI profile was installed on the aircraft, in addition, in connection with the preparation for the air parade, by order of the USSR NKAP, the LIS of plant No. 134 was relocated to the Central Airfield.

The new VK-107A engine with a 15-hour resource (instead of 25 hours) was received on July 7, and the modified VRDK compressor was received on August 2. Factory testing resumed on 7 August and continued until 18 October. Flights were stopped due to the development of the engine of its resource. By this time, 42 flights had been completed under the factory test program, 11 of them with the inclusion of the VRDK. The total flying time was 17 hours. 49 min.

On November 1, 1945, the production of the second flight copy of the aircraft was completed, which was transferred to TsAGI for aerodynamic research. At the beginning of 1946, the leading engineer S.Ya.Gorbunov addressed the Central Committee of the All-Union Communist Party of Bolsheviks with a letter in which he reported about delays in testing the Su-5 aircraft. The letter was forwarded to the People's Commissariat of the Aviation Industry. In his reply to G.M. Malenkov, Deputy Commissar A.S. Yakovlev wrote:
“... At factory tests on the plane of Comrade Mikoyan(meaning the I-250 fighter - editor's note) a maximum speed of 823 km / h was reached at an altitude of 7000 m, corresponding to the specified speed, but on the plane of Comrade Sukhoi, the speed was much less than the specified one, and the tests failed to identify the reasons for the shortfall in speed.

Due to the fact that the aircraft designed by comrade Mikoyan turned out to be more mature, the construction of an experimental series of 10 aircraft at factory No. 381 began on it. , therefore, the People's Commissariat of Aviation Industry instructed TsIAM to transfer the next tested engine to plant No. 381 for installation on the lead aircraft of an experimental series designed by Comrade Mikoyan, as more advanced.

To identify the reasons for the significant shortfall in the speed of the Sukhoi aircraft, the second copy of this aircraft was prepared for research by blowing in the TsAGI G-104 wind tunnel ... "

In fact, the fate of the Su-5 was already a foregone conclusion. Until the end of 1946, the new power plant did not arrive, and on November 30, 1946, a decree of the Council of Ministers of the USSR “On the termination of work on aircraft of the MAP experimental aircraft construction plan that had lost its relevance” was issued. It, among others, included the Su-5 aircraft with the following conclusion: “The specified flight data during the tests were not obtained and significantly overlapped on a similar aircraft of Comrade Mikoyan, which completed factory tests.”

Technical description.

The Su-5 aircraft is a single-seat monoplane of all-metal construction with duralumin skin 1-2 mm thick. The single-spar wing at the root has a TsAGI 1V10 profile with a relative thickness of 16.5%, at the end of the wing a NASA 230 profile with a relative thickness of 11%. The wing is double-console. The consoles are joined to the fuselage along the side ribs. The joint is removed under the fairing.

The fighter used ailerons of the "Frize" type with weight and aerodynamic compensation. On the left aileron is a controlled trim tab. Shields and ailerons - all-metal.

The aircraft provided for the installation of a NS-23 gun of 23 mm caliber with 100 rounds of ammunition. The gun was located in the collapse of the V-shaped engine and fired through the propeller hub. Two 12.7 mm UBS machine guns with 200 rounds of ammunition were installed above the engine. The machine guns were fired through the plane of the propeller and therefore was synchronized with its rotation.

The armor included an armored back with a thickness of 10 mm, a visor and a headrest made of transparent armor with a thickness of 65 mm. It was possible to install additional armor.

The propeller group (VMG) consisted of a VK-107A liquid-cooled piston engine with a power of 1650 hp. with a compressor drive box and a four-bladed all-metal variable-pitch propeller with a diameter of 2.9 m.

The VRDK consisted of an E-3020 axial compressor, a long compressor drive shaft, a combustion chamber with a system of prechambers and injectors. Air for the VRDK came from a nasal air intake located under the spinner of the propeller. The air channel ran under the VK-107A and through a cutout in the wing spar approached the axial compressor, and then followed to the front part of the combustion chamber with prechambers and nozzles installed in it. The rear of the combustion chamber was equipped with shutters to control the flow area of ​​the jet nozzle. The combustion chamber was cooled by air taken in after the compressor and entered into the gap between the annular screen and the outer wall of the combustion chamber. The VRDK was powered from the fuselage and right wing tanks.

Motor-compressor installation VDRK.

VRDK combustion chamber.

Four-blade variable pitch propeller - all-metal. The cabin protection consists of a 10 mm thick armored back, a visor and a bulletproof glass headrest.

The fuselage structure is of the monocoque type, made of duralumin. An air channel runs along the entire length of the fuselage, in which a compressor (driven by an engine), a water radiator and a nozzle chamber are sequentially placed. The tail part of the channel, made of heat-resistant steel, is a combustion chamber with an adjustable outlet. The nozzle part of the channel and the combustion chamber have a double wall, in the cavity of which air passes for cooling.

Oil cooler - in the tunnel of the left wing console with an exit on the lower surface of the wing. The main engine and VRDK are powered by fuel from two gas tanks located in the fuselage behind the cockpit and in the right wing console.

A cantilever metal non-adjustable stabilizer and a metal fin are fixed above the fuselage. The places of termination are closed with fairings. The rudders have weight and aerodynamic compensation, and are also equipped with metal controlled trim tabs.

The undercarriage retracts along the span into the wing tip using hydraulic control. Wheel size - 650 x 200 mm. The landing gear and wheels in the retracted position are closed by flaps. The crutch wheel retractable in flight and its retracting mechanism are located under the combustion chamber. Crutch wheel without protector, size 300 x 125 mm.

The Su-5 aircraft was painted green on top and light blue on the bottom (matte surface).

Modification: Su-5
Wingspan, m: 10.56
Length, m: 8.51
Height, m: 2.97
Wing area, m2: 17.00
Weight, kg
- empty aircraft: 2954
-maximum takeoff: 3604
Engine type: 1 x PD VK-107A + 1 x VRDK
- power, hp: 1 x 1650
Maximum speed, km/h: 830
Cruising speed, km/h: 640
Practical range, km: 600
Lifting capacity, m/min: 880
Practical ceiling, m: 12000
Crew: 1
Armament: 1 x 23 mm NS-23 cannon (100 rounds) and 2 x 12.7 mm UBS machine guns (400 rounds).

Su-5

piston jet fighter

At the beginning of 1944, the design bureau of Pavel Osipovich Sukhoi, on an initiative basis, developed a draft design of a fighter with a combined power plant, which consisted of one M-105A piston engine with a propeller and an additional compressor air-jet engine (VRDK), which served as an accelerator.

The compressor was driven by the M-105A engine using a shaft and a two-speed transmission.

At the end of July, the finalized draft design, which received the designation "D" or "I-107" in the Design Bureau, was submitted for consideration to the leadership of the NKAP and the Air Force of the spacecraft.

The approval of the conclusion on the preliminary design and the protocol of the mock-up commission coincided with the completion of work on a static copy of the aircraft, which was transferred for testing at TsAGI.

The Su-5 aircraft was a single-seat monoplane of all-metal construction with duralumin skin 1-2 mm thick.

The single-spar wing at the root had a TsAGI 1V10 profile with a relative thickness of 16.5, at the end of the wing a NASA 230 profile with a relative thickness of 11%. The wing was double-console. Console docked with the fuselage on the side ribs. The joint was removed under the fairing.

The fighter used ailerons of the "Frize" type with weight and aerodynamic compensation. On the left aileron there was a controlled trim tab. Shields and ailerons were all-metal.

The aircraft provided for the installation of a 23 mm H-23 gun with 100 rounds of ammunition. The gun was located in the collapse of the V-shaped engine and fired through the propeller hub. Two 12.7 mm UBS machine guns with 200 rounds of ammunition were installed above the engine. The machine guns were fired through the plane of the propeller and therefore was synchronized with its rotation.

The cabin protection consisted of a 10 mm thick armored back, a visor and a bulletproof glass headrest.

The monocoque fuselage was made of duralumin. An air channel ran along its entire length, in which a compressor driven by the main engine, a water radiator and a nozzle chamber were sequentially placed. The tail part of the channel, made of heat-resistant steel, was at the same time a combustion chamber with an adjustable outlet. The nozzle part of the channel and the combustion chamber had a double wall, in the cavity of which air passed for cooling.

The oil cooler was located in the tunnel of the left wing console with an exit on the lower surface of the wing. Fuel was supplied to the main engine and the VRDK from two gas tanks located in the fuselage behind the cockpit and in the right wing console.

A cantilever metal non-adjustable stabilizer and a metal fin were fixed above the fuselage. The places of termination were closed with fairings.

The rudders had weight and aerodynamic compensation, and were also equipped with metal controlled trim tabs.

The landing gear was retracted along the span to the wing tip using hydraulic control. The landing gear and wheels in the retracted position were covered with flaps. The crutch wheel retractable in flight and its retracting mechanism were located directly under the combustion chamber. The fighter used ailerons of the "Frize" type with weight and aerodynamic compensation. On the left aileron there was a controlled trimmer. Shields and ailerons - all-metal.

The four-bladed variable pitch propeller was also all-metal.

The construction of the flight copy was greatly delayed due to the untimely delivery of the power plant.

The first flight on the plane, which received the designation Su-5, the factory test pilot G.N. Komarov completed on April 6, 1945. Factory tests continued intermittently until the end of October. During this period, 42 flights were performed, eleven of them with the inclusion of the VRDK.

The resulting maximum speed was 18-20% lower than the calculated one. Therefore, the second flight copy of the aircraft, upon completion of construction, was transferred to TsAGI for aerodynamic studies in the T-101 tunnel.

Factory flight tests were carried out until June 15, on this day the VK-107A engine broke down in flight.

During the period of forced downtime due to the lack of an engine, a new wing with a TsAGI laminarized profile was installed on the aircraft.

The new VK-107A engine with a limited resource was received in early July, flight tests resumed in early August and continued until October 18. Flights were stopped due to the development of the engine of the established resource. All attempts to get new engine were not successful.

In November 1946, by a decree of the Council of Ministers of the USSR, work was stopped on a number of aircraft that "lost relevance", among which the Su-5 was named. By this time, aircraft with turbojet engines were already on trials.