Organization of the safe operation of the PS as part of the fire protection system. Organization of the safe operation of the PS as part of the PS Responsible for production control during the operation of the PS

  • 13.07.2020

B.9.31. Exploitation of hazardous production facilities, which use lifting structures designed for lifting and moving

Cargo

Topic 1. General requirements for PS

Question 1. Which of the HPFs listed below are not subject to the requirements of the FNP PS?

At HIFs where ropeways are operated

Question 2. Which of the following HPFs are subject to the requirements of the FNP PS?

At HIFs, where cargo electric trolleys are operated, moving along elevated rail tracks together with the control cabin

Question 3. What document confirms the compliance of the PS with the requirements of technical regulations?

Certificate or declaration of conformity

Question 4. Which mobile PSs do not require proof of eligibility technical regulation"On the safety of wheeled Vehicle»?

Cranes - pipelayers

Question 5. H What is meant by the term "Elevating Structure Incident"?

Failure of the PS used at the HIF, resulting in the PS inoperable, preventing its continued operation without repair

\ Question 6. H is understood by the term "Operating and I"?

Operation - stage life cycle The PS on which it is implemented is maintained and its quality is restored. The operation of the substation includes the use for its intended purpose (work), transportation, installation, storage, maintenance and repair

Question 7. What is meant by the technical examination of the substation?

A set of administrative and technical measures aimed at confirming the operability and industrial safety of the substation in operation

Question from 8. What what is meant by the term "crane cycle"?

The set of operations associated with the transportation of cargo by a crane during operation, from the moment when the crane is ready to lift the load, until the moment it is ready to lift the next load

Question 9. Which of the listed PS are not subject to registration in the bodies of Rostekhnadzor?

Pipelay Cranes

Question 10. Which of the listed PS are subject to registration in the bodies of Rostekhnadzor? Lifts and towers designed to move people

Question 11. Does an organization operating HPF with PS have the right to involve specialists from third-party organizations as: a specialist responsible for the implementation of production control during the operation of PS; a specialist responsible for maintaining the PS in working order; a specialist responsible for the safe performance of work using PS?

Has no right

Question 12 emergency?

Your immediate supervisor

Topic 2. Repair, reconstruction or modernization of the HIF substation

Question 1. What should be done for substations that have completed their service life in order to extend their service life?

Overhaul or complete repairs, as well as industrial safety expertise

Question 2. Which organization is responsible for the operation of PS not equipped with limiters, indicators and recorders necessary to ensure industrial safety of the process in which PS is used by the Federal Norms and Rules?

For the operating organization of the substation

Question 3. Representatives of which organizations sign the protocol in case of loss of long-term storage information during the repair of the recorder of the parameters of the PS operation?,

A specialized organization that carries out repair of the substation and the operating organization of the substation.

Topic 3. Operation of PS HPF

Question 1. Which organization has the right to make changes to the developed PPR (project for the production of works of the PS) to perform construction and installation work?

Only the organization - the developer of the WEP

Question 2. How much higher than objects and equipment encountered on the way should crane booms be when they are rotated or moved?

Not less than 500 mm

Question 3. What are the installation requirements for floor or radio operated cranes?

There must be free passage for the worker operating the crane

Question 4. In what cases is it possible to install stationary electric hoists or winches over production floors to lift goods through a hatch in the ceiling?

Installation not allowed

Question 5. At what position of the crane on the elevated rail track should the compliance of the distance from the protruding parts of the ends of the crane to the columns, walls of the building and the railings of the passage galleries be checked?

With a symmetrical arrangement of the crane wheels relative to the rail

Question 6. What is the distance from the top of the crane, moving along the elevated rail track, to the ceiling of the building or building structures above the crane?

Not less than 100 mm

Question 7. What is the distance from the lowest point of the crane (not counting the lifting body), moving along the elevated rail track, to the floor of the workshop or sites where people can be during the operation of the crane (with the exception of sites intended for crane repair)?

Not less than 2000 mm

Question 8. What is the distance from the lower protruding parts of the crane (not counting the lifting body), moving along the elevated rail track, to the equipment located in the coverage area?

Not less than 400 mm

Question 9. What is the horizontal distance between the protruding parts of the crane moving along the ground crane track and stacks of goods located at a height of up to 2000 mm from the level of work platforms?

Not less than 700 mm

Question 10. What is the vertical distance from the counterweight arm tower crane to areas where people can be?

Not less than 2000 mm

Question 11. At what distance from building elements, equipment and cargo stacks should electric hoists and monorail trolleys with automatic or semi-automatic control be installed, if during the movement these PS are not accompanied by an operator?

In such a way that during the movement to exclude the possibility of touching the elements of the building, equipment and cargo stacks with the cargo

Question 12

With the owner of the line

Question 13. In which case is it allowed to install a jib crane, a crane-manipulator only on two or three outriggers?

Not allowed, PS is installed on all outriggers

Question 14. Who determines the procedure for the operation of a crane near a power line made with a flexible insulated cable?

Line owner

Question 15. What distance should be observed between the crane boom and the contact wires when operating boom-type cranes under the included contact wires of urban transport in the presence of a limiter (stop)?

Not less than 1.0 m

Question 16. In what cases is it allowed to unload (load) bricks on pallets without fencing?

Only when unloading (loading) vehicles on the ground (and from the ground)

Question 17. What kind of loads during the tilting operation are called "loads of complex configuration"?

Loads with a shift in the center of gravity

Question 18

Not more than 200-" 00 mm

Question 19. In what cases is it allowed to move goods that are in an unstable position?

Forbidden

Question 20

Only in cases of using guide blocks that ensure the vertical position of the cargo ropes

Question 21

If the load is lifted only by the boom telescoping mechanism

Question 22, When is it permissible to turn a lifted load by hand?

In cases where the load is raised to a height of not more than 1000 mm

Question 23. What is the requirement for safe operation PS is incorrect?

Measures for the safe descent of crane operators must be indicated in the technological map

Question 24

If the shop (span) is not equipped with walk-through galleries along the rail track

Question 25

Preventing falls from a crane caused by the sudden start of movement of the crane or

his cargo trolley, run over by a neighboring crane, and defeat electric shock,

falling on railroad tracks or crane beams

Question 26

Substation must be de-energized and measures must be taken to prevent their hijacking by the wind

Question 27 technological processes slings?

Tested and marked lifting devices and containers corresponding to the mass and nature of the goods being moved

Question 28

When erecting buildings or structures with a height of more than 36 m

Question 29

In places of constant loading and unloading of cars and gondola cars

Question 30

Prohibited in all cases

Question 31

The load falling on each PS should not exceed the carrying capacity of the PS

Question 32. Is it allowed to move goods using PS over ceilings under which industrial, residential or office premises are located, where people can be?

Not allowed

Question 33

During operation of the PS equipped with a controlled gripper, grab or magnet

Question 34. Who issues a permit to start up a jib crane?

The specialist responsible for the implementation of production control during the operation of the substation, or the specialist responsible for safe execution works with the use of PS, depending on specific cases

Question 35

In a special register of accounting and inspection

Question 36

Commission decision i

Question 37. Who is the chairman of the commission established to decide on the commissioning of the substation after the installation of bridge-type cranes and a portal crane using welding? *

Authorized representative of the operating organization

Question 38. Who is appointed as the chairman of the commission established to decide on putting into operation, when changing the operating organization for a substation that has completed its service life?

Authorized representative of the operating organization

Question 39. How many days before the start of the work of the commission must the operating organization notify in writing the organizations whose representatives are included in the commission, about the work of the commission to put the substation into operation?

Not less than 10 days

Question 40. When are production instructions issued to personnel servicing the PS?

Before admission to work, against receipt

Question 41

Specialist responsible for the safe performance of work using PS

Question 42

A signalman from among the slingers must be appointed

Question 43

Specialists responsible for the safe performance of work using PS, crane operators (operators) and slingers

Question 44

Head of the operating organization performing work with the use of PS

Question 45

The strength of the wind at which its work is not allowed

Question 46

If it is provided for by a specially developed PPR %

Question 47

Guidelines (instructions) for the operation of the PS, and in the absence of instructions in it, the requirements of the FNP PS

Question 48. Which of the listed substations is allowed to carry out a full technical examination once every 5 years?

Substation that serve electrical and pumping stations, compressor units

Question 49

At least once every 12 months

Question 50

At least once every 3 years, with the exception of rarely used substations Question 51. What should be done after the overhaul of substations?

Extraordinary full technical examination

Question 52. In which of the following cases, during an extraordinary full technical examination of a substation, only static tests are carried out?

After replacing the lifting device

Question 53. Who should carry out the technical examination of the substation?

Specialist responsible for the implementation of production control during the operation of the PS with the participation of a specialist responsible for maintaining the PS in working condition

\J- Question 54 non-destructive testing suspension parts for lamellar hooks of cranes transporting molten metal and liquid slag?

The operating organization, unless otherwise specified in the operating manual of the substation

Question 55

If it is provided for by the PS passport

■ "Question 56. What is the duration of the static test of cable cranes?

Question 57 \ boom type is considered to have passed the static test?

If within 10 . in a minute the lifted load will not fall to the ground, and no cracks, residual deformations and other damage to metal structures and mechanisms were found

Question 58 ■

The mass of which is on! 0% exceeds its nameplate capacity

Question 59

Each mechanism must be tested by static and dynamic load

Question 60

With the one installed at the time of the

Question 61. What are the requirements for steel ropes installed on substations when replacing previously installed ones?

Steel ropes must comply with the brand, diameter and breaking force specified in the PS passport and have a certificate of the manufacturer

Question 62. What requirements must steel chains installed on substations meet?

Steel chains must comply with the grade and breaking force specified in the PS passport, have a certificate from the chain manufacturer.

Question 63

Requirements of design and operational documentation for the rail track

Question 64

In all of the above cases

Question 65

It is allowed only after the development of measures to prevent collision of operating cranes with rolling stock and coordination with the organization in charge of the organization of traffic on railway tracks

Question 66

If necessary

Question 67

Crane operator (operator) to the extent stipulated by the production instruction

Question 68 scheduled inspection state of the rail tracks of the substation by a specialist responsible for maintaining the substation in working order?

After every 24 work shifts

Question 69

Specialized organization

Question 70

At least once every three years

Question 71. How many branches for slings with more than three branches are taken into account in calculating their carrying capacity?

No more than three branches

Question 72

Every month

Question 73

Act or protocol

Question 74. In which of the following cases does the operating organization have the right to allow the substation to work?

For a rarely used substation, more than three years have passed since the previous technical examination

Question 75

15% or more of the value of the corresponding size of the unworn profile

Question 76. Which of the following is a condition for rejecting a crane rope that has been subjected to surface wear or corrosion?

Reducing the rope diameter by 7% or more compared to the nominal diameter even in the absence of visible wire breaks

Question 77. What mode of loading of PS mechanisms does not exist?

L2 - moderate

Question 78

More than 3.0% of the original ) size

Organization and implementation of production control over compliance with industrial safety requirements at a hazardous production facility, approved by a government decree Russian Federation dated March 10, 1999 N 263 (Sobraniye zakonodatelstva Rossiyskoy Federatsii, 1999, N 11, art. 1305; 2005, N 7, art. 560; 2013, N 31, art. 4214).

150. The operating organizations are obliged to ensure the maintenance of the substation in working condition and safe conditions for their work by organizing proper supervision and maintenance, technical examination and repair.

For these purposes, there must be:

a) established order periodic inspections, technical services and repairs that ensure the maintenance of substations, rail tracks, load-handling devices, devices and containers in working order;

B) the established procedure for certification (specialists) and admission to independent work(personnel) with the issuance of appropriate certificates, which indicate the type of substation, as well as the types of work and equipment for which they are allowed to work;

ConsultantPlus: note.

The numbering of subparagraphs is given in accordance with the official text of the document.

D) job descriptions for specialists and production instructions for personnel, magazines, programs for the implementation of preventive maintenance, PPR, TC, slinging, storage schemes have been developed;

e) ensuring that specialists have these FNR, job descriptions and guidelines for the safe operation of the substation, and for personnel - production instructions;

f) conditions have been created for strict compliance by specialists with the requirements of these FNR, job descriptions, and by personnel - production instructions.

151. The number of specialists of the operating organization should be determined by the administrative act of the operating organization, taking into account the requirements of subparagraph "g" of paragraph 23 of these FNR, as well as taking into account the number and actual operating conditions of the substation.

152. During vacations, business trips, illness or in other cases of absence of responsible specialists, the performance of their duties is assigned by the operating organization's administrative act to employees replacing them in their position, having the appropriate qualifications, who have been trained and certified.

153. Periodic check knowledge of job descriptions and these FNR from specialists responsible for the implementation of production control during the operation of the substation, specialists responsible for maintaining the substation in working condition, and specialists responsible for the safe performance of work, should be carried out in accordance with the administrative act of the operating organization and carried out by its commission .

154. For the management of the substations and their maintenance, the operating organization is obliged to appoint by an administrative act hoist drivers, crane operators (operators), their assistants, slingers, locksmiths, electricians, cradle workers and adjusters (except adjusters of involved specialized organizations).

Employees of other organizations who meet the requirements specified in the manual (instruction) for the operation of the lift (tower) may be allowed as workers on the cradle of lifts (towers) after these workers have been instructed by a specialist responsible for the safe performance of work using PS.

Workers trained in accordance with the requirements set forth in the manual (instruction) for the operation of such a substation may be allowed to control the substation from the floor or from a stationary console, and remote control(by radio), in addition, taking into account the requirements set forth in the manual (instruction) for the operation of the remote control system.

155. To control a truck crane (crane-manipulator), an auto-hydraulic lift (tower), a car driver may be appointed after he has been trained in the prescribed manner.

(see text in previous edition)

156. In order to ensure industrial safety, the operating organization is obliged to provide the personnel with production instructions that define their duties, the procedure for the safe performance of work and responsibility. Production instructions to personnel must be issued against receipt before they are allowed to work.

157. In cases where the area served by the PS is not completely visible from the control cabin (from the control place), and in the absence of radio or telephone communication between the operator (crane operator) and the slinger, a signal must be assigned to the operator (crane operator) to transmit a signal slinger signalman. Such signalmen are appointed by a specialist responsible for the safe performance of work using PS.

Is it possible to industrial enterprise to appoint a specialist in labor protection responsible for organizing and implementing production control over compliance with industrial safety requirements at a hazardous production facility, the management of engineering and technical personnel for the supervision, operation and maintenance of Rostekhnadzor facilities in working order?

Answer

Answer to the question:

Federal norms and rules in the field of industrial safety are approved by Rostekhnadzor. At the same time, the norms and rules are not universal, they differ depending on the industry, on the types of work, the use of mechanisms.

Don't miss: the main article of the month from leading specialists of the Ministry of Labor and Rostrud

Encyclopedia of labor protection "turnkey" with a unique set of mandatory samples from the Kadra System.

Since the enterprise is engaged in the production of reinforced concrete products, it uses lifting facilities. In this regard, the enterprise is subject to the Safety Rules for hazardous production facilities that use lifting structures (approved by order of Rostekhnadzor dated November 12, 2013 N 533). These rules establish the obligation to develop and approve by an administrative act of the operating organization instructions with official duties, as well as a list of names of persons responsible for industrial safety in the organization from among its certified specialists:

Specialist responsible for the implementation of production control during the operation of the substation;

The specialist responsible for maintaining the PS in working condition;

A specialist responsible for the safe performance of work using PS.

Thus, in an organization using lifting structures, three safety specialists should be appointed.

At the same time, in organizations where work with the use of PS is carried out at one site (workshop), it is allowed for one specialist to combine the duties of being responsible for maintaining the PS in working condition and for the safe production of work.

In addition, it should be borne in mind that the employee responsible for the implementation of production control must have:

Higher technical education corresponding to the profile of the production facility;

At least 3 years of work experience in a relevant job at a hazardous production facility in the industry;

A certificate confirming the completion of industrial safety certification (clause 9 of the Rules for organizing and exercising production control over compliance with industrial safety requirements at a hazardous production facility, approved by Decree of the Government of the Russian Federation of March 10, 1999 N 263).

Therefore, if the labor protection specialist meets the requirements for employees responsible for the implementation of production control, he can combine his functions with the performance of the work of one safety specialist. Or, under the above conditions, combine the duties of a specialist responsible for maintaining the PS in working condition and a specialist responsible for the safe performance of work using PS.

The employer is not entitled to assign the duties of all safety specialists to a labor protection specialist.

Details in the materials of the System Personnel:

Situation :How to organize production control for compliance with industrial safety requirements

Ksenia SLADKOVA, expert of the magazine "Reference book of labor protection specialist"

Organizations that operate hazardous production facilities are required to conduct production control over compliance with industrial safety requirements. It gives an idea of ​​the state of industrial safety in the enterprise and helps to prevent accidents.

What documents are needed for production control

The main document by which production control is carried out is the Regulation on Production Control (hereinafter referred to as the Regulation). It regulates the entire production control procedure - from planning and conducting internal audits to the procedure for recording the results of control. The position must be at any HPO ( federal law dated July 21, 1997 No. 116-FZ). It will be needed not only for production control, but also for:

note

The procedure for organizing production control is established

  • formation and submission to Rostekhnadzor of an annual mandatory report on production control at HIFs;
  • obtaining a license from Rostekhnadzor for the operation of HIFs;
  • registration technical device in the bodies of Rostekhnadzor;
  • successful completion of any scheduled and unscheduled inspection.

The regulation is approved by the head of the enterprise, and its certified copy is provided to the territorial Rostekhnadzor at the location of the hazardous production facility.

The enterprise must also have a production control plan for the year, which reflects operational, targeted and comprehensive inspections.

What is production control?

Production control takes place in three levels.

First level These are operational checks during which they monitor the compliance of personnel and contractors with industrial safety requirements.

Reviewers must:

  • read the technical documentation on the issues being checked;
  • identify violations of the rules in the workplace;
  • selectively check the knowledge of industrial safety with specialists;
  • remove untrained employees from work;
  • suspend work if a violation is detected that threatens people's lives or may lead to an accident;
  • install control period elimination of violations;
  • inform the immediate supervisor about the identified violations and the measures taken.

Second level control means targeted checks. They are needed to make sure that all industrial safety measures are carried out in a quality and timely manner.

Reviewers evaluate:

  • condition of production facilities, organization of work and their compliance with industrial safety requirements;
  • implementation of previous regulations based on the results of operational, comprehensive and targeted inspections;
  • training, certification of managers, specialists and workers and their admission to independent work;
  • implementation of planned activities for the organization of production control and ensuring the safe operation of HIFs;
  • the completeness and quality of the implementation of measures after accidents and accidents.

Third level control consists in a comprehensive inspection of the enterprise, which is carried out by the production control commission. During the audit, you need to evaluate:

  • technical condition of HPF;
  • how the safe operation of HIFs is organized;
  • how measures are taken to ensure safe working conditions;
  • efficiency of production control.

Who will be in charge of production control

Production control is carried out by an employee appointed by order of the head, or the production control service. If the enterprise employs less than 150 people, then one of the deputy heads of the enterprise is appointed responsible for production control. With a staff of 150-500 people, a separate specialist is allocated who will deal only with production control. If the HIF employs more than 500 workers, it is necessary to create a production control service.

note

Employees responsible for production control must have a higher technical education in the HIF work profile, at least three years of work experience at HIFs and an industrial safety attestation certificate

An example of the distribution of responsibilities for production control is given in the table.

Distribution of responsibilities for production control

Level of control Employees who carry out control in general at the enterprise Employees conducting control in branches
The first Heads of shops, laboratories, warehouses and their deputies.
Site masters.
Employees appointed responsible for HIFs
Second Directors for types of production, material planning and logistics.
Deputy technical director.
Services of the chief power engineer, mechanic, metrologist, designer, technologist, technical control.
Heads and specialists of departments and departments.
Teachers and masters of industrial training
Deputy Chief Engineer.
Heads and specialists of departments and services
Third CEO.
Technical Director and his deputies.
Production control commission at the enterprise.
Head and specialists of the industrial safety and labor protection department
Branch directors.
Chief Engineers.
Production Control Commissions.
Heads and specialists of the industrial safety and labor protection department

What documents are issued based on the results of control

A report is generated after each level of control. It describes the purpose of the audit, identified violations, proposed measures and the timing of their elimination. Reports are approved by the general director or directors of branches. Then they are transferred to the department of industrial safety and labor protection, where specialists:

  • fill in the register of industrial safety measures at HIFs;
  • control the elimination of identified violations;
  • according to the information received, prepare for the annual technical meeting with the management;
  • submit to Rostekhnadzor information on accidents and incidents, their causes and measures taken, as well as on production control.

The identified problems can be solved by the inspectors together with the specialists responsible for the operation of a specific HPF after each level of control. More global shortcomings are dealt with by the commission of production control together with the management of the enterprise. The approved measures to ensure industrial safety are included in the implementation plan for the next year.

Added to site:

1. General Provisions

1.1. This manual has been developed in accordance with the requirements of "" approved. by order Federal Service on environmental, technological and nuclear supervision dated November 12, 2013 No. 533.

1.2. The specialist responsible for the implementation of production control during the operation of lifting structures (hereinafter referred to as the responsible specialist) is appointed by order CEO, after passing certification in the field of industrial safety and receiving a job description.

1.4. Re-certification of a responsible specialist is carried out at least once every 5 years.

1.5. The responsible specialist reports to the head of the department of labor protection, industrial and environmental safety, and in his absence - to the general director.

1.7. The responsible specialist exercises production control over the safe operation of lifting structures, removable load-handling devices, containers and rail tracks.

1.8. For the period of vacation, business trip, illness and in other cases of absence of a responsible specialist, the execution of his duties is assigned by order to another employee with the appropriate qualifications.

1.9. The responsible person must know:

1.9.1. Safety rules for hazardous production facilities that use lifting structures;

1.9.2. Rules for the installation of electrical installations (PUE) section "Electrical equipment of cranes";

1.9.3. Rules on labor protection during the operation of electrical installations;

1.9.4. job description;

1.9.5. Requirements of instructions for the operation of lifting structures of manufacturers;

1.9.6. responsible for the maintenance of lifting structures in working condition and specialists responsible for safe production using lifting structures.

Production instructions for personnel engaged in the repair and maintenance of lifting structures;

1.9.8. Guidelines on the inspection of lifting machines that have worked out the standard service life;

1.9.9. Information letters Rostekhnadzor for the prevention of accidents and accidents during the operation of lifting structures.

2. Responsibilities

2.1. The responsible person must:

2.1.1. To carry out production control over the technical condition and safe operation of lifting structures, removable load-handling devices, containers, rail tracks and take measures to prevent violations of safety rules;

2.1.2. Carry out technical examinations of lifting structures not registered with Rostekhnadzor, as well as keep records of them;

2.1.3. Supervise the implementation of issued state. inspectors of Rostekhnadzor prescriptions;

2.1.4. Monitor compliance with the schedules of repairs, maintenance and periodic inspections of lifting structures, rail tracks, removable load-handling devices and containers;

2.1.5. Participate in commissions for the certification of specialists in the field of industrial safety and testing the knowledge of maintenance and repair personnel;

2.1.6. Check compliance with the procedure for the admission of personnel to maintenance of lifting structures established by the safety rules;

2.1.7. Monitor the availability and implementation of instructions by service personnel and responsible specialists;

2.1.8. Check compliance with the requirements of safety rules, projects for the production of work and technological maps in the production of work using lifting structures;

2.1.10. Check availability at work site technical documentation for the operation of lifting structures;

2.1.11. Monitor compliance with the established procedure for putting lifting structures into operation;

2.1.12. Check compliance with the procedure established by the owner for the allocation and direction of mobile lifting structures to objects;

2.1.13. To bring to the attention of service personnel, managers and specialists related to the operation of lifting structures information on the state of accidents and injuries, with an analysis of violations during the operation of lifting structures;

2.1.14. To be present at inspections of the state of technical safety of lifting structures by representatives of Rostekhnadzor bodies.

2.2. The specialist responsible for the implementation of production control during the operation of lifting structures should not allow them to work if, during the check, he found that:

2.2.1. Repair and maintenance of lifting structures is carried out by personnel who have not passed the knowledge test;

2.2.2. Specialists responsible for the safe performance of work using lifting structures and specialists responsible for the working condition of lifting structures have not been appointed;

2.2.3. The period of technical examination of lifting structures has expired;

2.2.4. The instructions issued by him or Rostekhnadzor bodies to ensure the safe operation of hoisting machines have not been fulfilled;

2.2.5. Technical malfunctions were identified on lifting structures: cracks or deformations of metal structures, loosening of fasteners in the joints of metal structures, malfunction of safety devices and devices, malfunction of the control system, unacceptable wear of hooks, ropes, chains, malfunction of mechanisms and brakes, malfunction of the rail track, malfunction of grounding or electrical equipment;

2.2.6. There are no removable load-handling devices and containers corresponding to the mass and type of transported goods or they are faulty;

2.2.7. Works are carried out without projects for the production of works, technological maps, work permits;

2.2.8. Measures for the safe conduct of work, set out in the projects for the production of works, have not been implemented, technological maps, work permits;

2.2.9. Passports of lifting facilities or information about its registration with Rostekhnadzor bodies are missing, lost;

2.2.10. Work with the use of lifting structures is carried out with violations of safety rules and instructions, which can lead to an accident or injury to people.

3. Rights

3.1. The specialist responsible for the implementation of production control during the operation of lifting structures has the right to:

3.1.1. At any time, visit workshops and sites related to the operation of lifting structures, check their technical condition, operating conditions. as well as compliance by managers and specialists, and maintenance personnel with safety rules, production instructions and other regulations in the field of industrial safety;

3.1.2. Stop the operation of lifting structures in the cases specified in clause 2.2. this instruction;

3.1.3. Claim from technical services enterprises, managers and specialists, presentation for verification of documents on issues related to the operation of lifting structures;

3.1.4. To give instructions obligatory for the administration of workshops, departments and set deadlines for the elimination of identified violations;

3.1.5. Raise a question before the administration of the enterprise about the removal from the performance of work on the repair and maintenance of lifting structures of persons who violate the requirements of federal and local regulations in the field of industrial safety;

3.1.6. Raise the issue of punishing employees responsible for violations of industrial safety requirements during the operation of lifting structures.

4. Responsibility

4.1. The specialist responsible for the implementation of production control during the operation of lifting structures is responsible in accordance with applicable law for.