Regulations of the technical department. Production and technical department in construction. Functions of a PTO engineer

  • 14.02.2021

Applies PTO engineer to the category of specialists or managers? Given the range of duties of a PTO engineer, one cannot do without subordinates. But this largely depends on the size of the company and the scope of its activities. We offer you a sample job description for a PTO construction engineer.

Job description of a PTO engineer (for construction)

APPROVE
CEO
Surname I.O. ________________
"________"_____________ ____ G.

1. General Provisions

1.1. The PTO engineer belongs to the category of specialists.
1.2. The VET engineer is appointed to the position and dismissed from it by order CEO on the recommendation of the head of the structural unit.
1.3. The PTO engineer reports directly to the head of the structural unit.
1.4. A person who meets the following requirements is appointed to the position of a VET engineer: initial professional or secondary professional education with at least one year of experience in the relevant field.
1.5. During the absence of a PTO engineer, his rights and obligations are transferred to another official, which is announced in the order for the organization.
1.6. The PTO engineer must know:
- legislation and other regulatory legal acts regulating the activities of construction organizations;
- profile, specialization, prospects for technical and economic development enterprises; production capacity of the enterprise;
- the procedure for the development and approval of construction plans;
- technology and methods of conducting construction works;
- building regulations;
- the procedure for the development and execution of design estimates and other technical documentation, keeping records and compiling reports on the activities of the enterprise in the field of construction;
- order of acceptance of works, objects and methods of their quality control.
1.7. The PTO engineer is guided in his activities by:
- legislative acts of the Russian Federation;
- Charter of the organization, internal labor regulations, other regulations of the company;
- orders and directives of the management;
- real job description.

2. Job responsibilities of the PTO engineer

The PTO Engineer performs the following job responsibilities:
2.1. Carries out technical supervision of construction and installation works.
2.2. Checks the compliance of the volumes of construction and installation works, as well as the structures of the approved design and estimate documentation, working drawings, building codes and rules, standards, specifications, labor protection standards.
2.3. Takes part in the review and approval of changes in design decisions that arise during construction, promptly resolves issues of replacing, if necessary, materials, products, structures (without reducing the quality of construction objects).
2.4. It studies the reasons causing failures in deadlines and deterioration in the quality of construction and
installation work, take part in their elimination.
2.5. Carries out technical acceptance of completed construction and installation works and
objects, draws up the necessary technical documentation. Participates in the work of commissions for the acceptance of construction projects and their commissioning.
2.6. Keeps records of completed construction and installation works and prepares the necessary data for reporting on the implementation of construction plans.
2.7. Checking the estimate documentation for the construction of facilities, calculating the cost, accounting for the work performed.
2.8. Prepares estimates for additional work.
2.9. Checks the estimate documentation received from the customer and prepares conclusions about its quality.
2.10. Coordinates with the design organization and the customer estimates, costing materials and additional costs, statements of work performed, specifications, acts of work performed, percentages.
2.11. Maintains established reports.
2.12. Performs individual official assignments of his immediate superior.

3. Rights of the VET engineer

The PTO engineer has the right to:
3.1. To give instructions to subordinate employees and services, tasks on a range of issues included in his functional duties.
3.2. Control the implementation of planned tasks and works, timely completion
individual assignments and assignments by subdivisions subordinate to him.
3.3. Request from structural divisions enterprise information and documents necessary for the performance of his duties.
3.4. Engage in relationships with departments of third-party institutions and organizations to resolve operational issues production activities within its competence.
3.5. Submit proposals for improvement of the work related to the responsibilities provided for in this instruction for consideration by the management.
3.6. Require the management of the enterprise to ensure the organizational and technical conditions and execution of the established documents necessary for the performance of official duties.

4. Responsibilities of the PHE Engineer

The PTO Engineer is responsible for:
4.1. For non-performance and / or untimely, negligent performance of their duties.
4.2. For non-compliance current instructions, orders and instructions for the preservation of trade secrets and confidential information.
4.3. For violation of the internal labor regulations, labor discipline, safety regulations and fire safety.

In order to find out what the PTO engineer is responsible for and what he is directly involved in (the presence of such a specialist must be provided for at every production or construction enterprise), you should first understand the features and main functions of the department where he works.

Purpose of the production and technical department

The activity of the production and technical department is connected with the preparation of construction and production.

Among the main functions of the PTO are:

  • preparation and approval of project documentation;
  • preparation of all necessary estimates and calculations;
  • ensuring control over the production process;
  • assistance in the implementation of construction and installation works;
  • preparation and drafting of contracts with relevant organizations and subcontractors.

PTO, guided by the design and estimate documentation, is developing technological maps and projects.

One of the most important areas of VET is the rational and efficient accounting / use of innovative technologies (construction mechanisms, machines, other necessary devices, the latest work methods). In addition, PTO employees should ensure constant monitoring of the implementation of projects involving various subcontractors, as well as providing the necessary briefing related to the performance of work in the designated areas.

In cooperation with accounting and planning departments, VET employees make various calculations for plans and requests, and prepare reporting documentation.

The department's responsibilities include:

  • implementation of technical accounting of equipment operation;
  • preparation of technical reports;
  • analysis of economic and technical indicators work;
  • designing schedules related to the repair of equipment;
  • ensuring control over compliance with the standard costs of materials;
  • timely registration of applications for the necessary parts of equipment / materials.

Among all employees of this department, the most complex types of work, as a rule, are assigned to PTO engineers.

The purpose of the position of an engineer in the department

Who is a PTO engineer? First of all, we are talking about the position provided for in the production and technical department, which is necessary for making various calculations and ensuring control over the quality of implementation various kinds works.

This position should be occupied by a person who has a special education and relevant work experience (at least a year) in the field in question.

Since not everyone can own all the nuances of production and the features of the implementation of construction and installation works.

What knowledge should a PTO specialist have?

A PTO engineer is a person who is well versed in the law, while at the same time regulating the activities of construction departments and enterprises. In addition, he must have an understanding of all the specifics and features of the technical and economic development of his organization (major direction, specialization, promising areas) and its capabilities, in particular, production capacity. The engineer is charged with the duty not only to understand, but also to take into account all the subtleties of the preparation and approval of plans related to construction work.

When implementing your professional activity the engineer takes into account the specifics of construction (methods / technology), having knowledge of the norms and rules approved by law for the performance of construction work. In addition to preparing various technical documentation (budget, design, etc.) and maintaining accounting documentation, he also draws up final and interim reports on the implementation of all work on the approved project.

How is the activity of a PTO engineer regulated?

Allocate regulatory documents that should be observed by each person holding the position in question.

It's about:

  • about legislative acts RF;
  • about the charter of the organization;
  • on the internal regulations of the organization;
  • about various regulations and instructions of the organization;
  • about orders and orders of the governing body;
  • on the job description of a VET engineer of a company, organization, production.

What types of work does a PTO engineer do?

First of all, the person holding the position of an engineer is obliged to carry out systematic supervision of the quality and level of performance of various construction and production works, to check in a timely manner the conformity of structures and the volume of work performed according to pre-approved documentation (drawings, estimates, projects, standards, technical specifications, other). In addition, the engineer monitors compliance with labor protection rules at the construction site and production.

If it becomes necessary to make adjustments to an already implemented project, the engineer coordinates issues related to the replacement of materials, products, mechanisms, structures of appropriate quality. In case of occurrence possible problems when carrying out construction work related to the failure to meet deadlines, deterioration in quality, as well as other violations, the specialist analyzes the causes with their subsequent elimination.

What rights does a PTO engineer have?

The engineer has the right to give employees tasks and instructions related to their functional duties.

He can also exercise control over all stages of production and construction work (quality level, timeliness of execution, compliance with rules and regulations). In addition, the engineer may at any time require the organization to provide additional information and the necessary documentation in order to quickly carry out their own work.

It is allowed for a PTO engineer to turn to other enterprises for help in order to resolve various issues within his competence. If, within the framework of the project, the engineer considers that additional opportunities should be applied to improve construction and installation works, he has the right to make his own proposals and ideas and submit them to the management of the organization.

About the features of budgeting and accepting work

The duties of an engineer are charged with the production of various calculations, as well as the acceptance of already completed production and construction work. He coordinates the estimate and cost calculation necessary equipment and materials between the project developer and the customer.

In addition, the PTO engineer takes part in the commission regarding the commissioning of the finished facility. It also bears the responsibility associated with the compliance of preliminary estimates with actual costs. If it becomes necessary to attract additional investment or apply new types of work, the engineer carries out necessary calculations with necessary justification.


In addition, VET staff must not only constantly monitor the progress of projects implemented by various subcontractors, but also conduct necessary briefing regarding site work. VET employees, cooperating with the planning departments and accounting departments, make various calculations for applications and plans, and compile reporting documentation. The department's responsibilities include:

  • maintenance of technical records of the operation of various equipment;
  • preparation of technical reports;
  • analysis of technical and economic indicators work;
  • planning equipment repair schedules;
  • monitoring compliance with the standard costs of materials;
  • timely submission of applications necessary materials or equipment parts.

Among all employees of this department, the most complex types of work are carried out by PTO engineers.

Production and technical department in construction

The customer provides the entire package of technical documentation for checking the compliance of estimates with working drawings. Employees of the department analyze and, if there are comments, they draw them up for transfer to the customer. After settlement of all disagreements, an agreement or contract is drawn up for the volumes described in the estimate at current prices.


The estimate is an integral annex to the contract, which indicates the cost in monetary terms, the timing of the work and the conditions for their production. When the contract is concluded, then all design and estimate documentation is transferred from the customer to the production department. It is registered and approved by the chief engineer "for production".
In addition to the technical documentation, the customer also submits other papers (for the allotment of the site and others) for the execution of a package of documents for obtaining a permit for the work.

Attention

In addition, the PTO engineer participates in the commission for the commissioning of the finished facility. He is also responsible for the compliance of preliminary calculations with real costs. If during the implementation of the project it becomes necessary to include additional financing or introduce any new types of work, the engineer justifies this and makes all the necessary calculations.


What rights does the engineer of the production and technical department have? The engineer of the department has the right to give instructions and tasks to employees in order to fulfill their functional duties. He can also control all stages of construction and production work (timeliness of implementation, compliance with norms and rules, quality level).

Production and technical department.

Important

PTO in its work is guided by: - ​​Charter JSC; - normative legal documents on construction issues on the territory Russian Federation; - orders, instructions of the JSC management; - guidance and methodological materials regulating production planning, operational management of production; - by this Regulation. 2. Main tasks of VET Organization of construction and reconstruction, preparation of production. Ensuring the timely commissioning of construction projects.


Saving the company's funds through the effective use of capital investments, the development of measures to reduce the cost of construction and installation work. Organization of the rhythmic work of sections, divisions and the enterprise as a whole. Increasing the organizational and technical level electrical production.

Construction organization structure

After processing all the sets and placing orders for materials and products (prefabricated reinforced concrete, reinforcement, concrete, mortar, etc.), orders for products and structures are placed in the summary sheet to manufacturers and suppliers. Before the start of construction, the department issues a work progress log to the facility, laced and numbered, signed by the manager and stamped. In addition, a work log is filled out to control the volumes performed.
At the end of the month, acts of completed work are accepted from line engineers and subcontractors. Drafts of percentages must be checked and endorsed by the representative of the technical supervision of the customer. Only after that the processing of documents takes place. The engineer of the production department checks the compliance of the percentage with the estimate.

Regulations on the production and technical department (PTO)

The approved technical documentation is issued to the construction site, to subcontractors, with whom contracts are concluded according to the same scheme. Engineers of the department draw up a project for the production of works (PPR), technological maps, a construction organization project (POS) with a license for this type of activity. The next step is engineering. These are the volumes that are planned to be completed in a month. Linear engineering and technical personnel make up sets of works for which production - technical department in construction draws up applications for material values, deciphers labor costs by performers, analyzes the compliance of applications submitted by foremen with project technical documentation, regulatory documents.

Pto engineer. what is this profession? What are the duties of a PTO engineer?

it offer, an estimate that has been reviewed by an organization that has a license and other package required to participate in the tender. The production and technical department in construction takes part in the annual or non-scheduled inventory of the department, prepares information by correspondence with the State Administration, customers and subcontractors. Performs an examination of the estimates of third-party organizations, if it is provided for by the license, draws up materials for participation in competitions, together with the firm's lawyer, forms the necessary materials for participation in the Arbitration Courts.
Prepares materials in the framework of the management accounting policy, participates in production meetings, technical councils, selects and analyzes the balances of completed volumes for construction projects and other current issues.
Implementation of technical supervision of construction: - current control the volume and quality of the work performed, for their compliance with the approved design and estimate documentation, working drawings, building codes, standards, safety standards, the requirements of rational labor organization; - verification of compliance with the decisions developed in the project for the production of works; - control of timely delivery of works to the customer and controlling authorities; - development of measures to reduce the cost of construction and coordination of changes in design decisions with the customer and design organizations; - solution of current issues related to the production of works arising during construction. 4. Putting objects into operation: - preparation of documentation on completed objects for the selection committee; - control of timely delivery of works to the customer (signing of acts).

The structure of the production and technical department of a construction organization

General Provisions The Production and Technical Department (PTO) is an independent structural subdivision of OJSC Luch (JSC) and reports directly to the Deputy General Director for Production Activities. PTO is created, reorganized and liquidated by order of the general director of the joint-stock company. The head of the VET directly supervises the activities of the department. A person with a higher technical education in a specialty corresponding to the profile of the JSC, with at least 5 years of experience in electrical installation production in engineering and technical positions, is appointed to the position of head of the PTO. Appointment to the position of head of the PTO JSC, transfer and dismissal are made by the general director upon agreement and petition of the deputy general director for production activities.
the Charter of the enterprise; — regulatory legal documents on construction issues in the territory of the Russian Federation; - orders, orders of the enterprise management; - guidance and methodological materials regulating production planning, operational management of production; - by this Regulation. 2. The main tasks of VET: - Organization of construction and reconstruction, preparation of production; — Ensuring the timely commissioning of construction projects; — Saving the enterprise's funds through the effective use of capital investments, the development of measures to reduce the cost of construction and installation works; – Organization of the rhythmic work of sections, divisions and the enterprise as a whole; — Increasing the organizational and technical production; — Coordination of annual volumes of work with customers, general contractors and subcontractors. 3. The structure of VET.
Consideration, study and implementation of calculations, carrying out the necessary coordination on the implementation of the design assignment in accordance with the information received from the customer for the design. Performs the graphic part of the project and its reproduction, in accordance with the requirements of the design and estimate documentation. 11. Calculates cost design work and preparation of documentation for payment.

The main task of the technical department is continuous improvement technological processes production based on the introduction of the latest achievements of science and technology in accordance with the specified main task, the technological department is entrusted with:

Organization of technical preparation of production and other types of core activities of the enterprise, ensuring the acceleration of growth rates of labor productivity;

Work coordination technical services enterprises for testing new technical means, creating and mastering new types of products, complex mechanization and automation of production;

Compilation of current and long-term plans enterprise development;

Consideration and approval of design documentation of the enterprise for the modernization of equipment;

Control over the observance and execution of contracts.

Job description of the head of the technical department.

I. GENERAL PROVISIONS

1.1. The head of the technical department belongs to the category of managers,

hired and dismissed from work by order of the director of the enterprise.

1.2. A person who has

higher technical education and work experience in technical training

production at engineering and technical and leadership positions at least 5 years.

1.3. The head of the technical department reports to ________________

__________________________________________________________________.

1.4. In his activities, the head of the technical department is guided by:

Regulatory documents on technical preparation of production;

methodological materials relating to relevant issues;

the Charter of the enterprise;

Labor regulations;

Orders and orders of the director of the enterprise, (immediate supervisor);

This job description.

1.5. The head of the technical department should know:

Decrees, orders, orders of higher authorities, methodological, regulatory and other guidance materials on the technical preparation of production;

Directions and prospects for the development of the industry and enterprise;

Technology of production of the company's products;

Production capacity and operating modes of equipment, rules for its operation, methods for identifying and using production reserves;

Technical requirements for raw materials, materials and finished products;

Requirements for the organization of labor in the design of technological processes and equipment;

Organization of technical preparation of production;

Procedure for acceptance of equipment into operation;

Methods of determination economic efficiency introduction of new equipment and technology, labor organization, rationalization proposals and inventions;

Experience of leading domestic and foreign enterprises in the field

technical preparation of production, organization of labor and management;

Basics labor law;

Rules and norms of labor protection, safety measures, industrial sanitation and fire protection.

1.6. During the absence of the head of the technical department, his duties

is carried out in accordance with the established procedure by the appointed deputy, who is fully responsible for their proper execution.

II. FUNCTIONS

The following functions are assigned to the head of the technical department:

2.1. Management of the technical department.

2.2. Organization of technical preparation of production or other types of core activities of the enterprise.

2.3. Coordination of work of technical services of the enterprise.

2.4. Management of the planning of the technical development of the enterprise.

2.5. Organization of work to improve the skills of department employees.

2.6. Ensuring healthy and safe conditions labor for subordinates

performers, monitoring their compliance with the requirements of legislative and regulatory acts on labor protection.

III. JOB DUTIES

To perform the functions assigned to him, the head of the technical department must:

3.1. organize technical training production or other types of the main activity of the enterprise, to ensure the acceleration of the growth rate of labor productivity, the reduction of labor costs for production, the improvement of the quality of products, works (services).

3.2. Coordinate the work of the technical services of the enterprise for testing new technical means, creation and development of new types of products, complex mechanization and automation of production, planning the introduction of scientific and technological achievements, new equipment and advanced technology.

3.3. Manage the current and long-term planning of the technical development of the enterprise, its production base.

3.4. lead the drafting terms of reference for the design of newly built industries, structures, technical facilities, the expansion, development and reconstruction of existing ones, for the introduction of mechanization and automation facilities.

3.5. Consider and agree on design documentation for the modernization of equipment and the rationalization of jobs.

3.6. To exercise control over the conclusion and execution of contracts related to the introduction of new equipment, as well as over the financing and correctness of calculations of the economic efficiency of measures for the development of new equipment and technology, new types of raw materials and finished products.

3.7. Participate in the development and introduction into production of resource-saving technologies, progressive consumption rates of the main types of raw materials and materials, in the study of the causes of defects and the production of products of reduced quality and grade, in the development of measures to improve the quality of products (works, services) and more efficient use of production capacities.

3.8. Perform in the absence of independent design and

technology departments function as their leaders.

3.9. Direct the activities of departments dealing with issues of standardization of products, scientific and technical information, as well as the organization of patent and inventive work.

3.10. Supervise department staff, coordinate and direct

activity of the enterprise subdivisions providing technical preparation of production.

The head of the technical department has the right to:

4.1. Get acquainted with the draft decisions of the enterprise management regarding the activities of the department.

4.2. Submit proposals for improvement to management

activities of the enterprise and the technical department.

4.3. Sign and endorse documents within their competence.

4.4. Liaise with the heads of all departments

divisions of the enterprise, receive information and documents necessary for the performance of official duties.

4.5. Submit to the director of the enterprise representations about

appointment, transfer, dismissal of employees of the department, proposals for their encouragement or the imposition of penalties on them.

4.6. Require the management of the enterprise to assist in the performance of their duties and rights.

V. RESPONSIBILITY

The head of the technical department is responsible for:

5.1. For failure to perform (improper performance) of their official

duties stipulated by this job description, to the extent determined by the current labor legislation.

5.2. For those committed in the course of carrying out their activities

offenses - within the limits determined by the current administrative, criminal and civil legislation.

5.3. For causing material damage- within the limits

current labor, criminal and civil legislation.

Planning and Economic Department.

The planning and economic department (PEO) is the headquarters of all planned work at the enterprise. He carries out long-term and current technical and economic planning of production, maintains statistical records, sums up and analyzes the results of the production activities of the enterprise, workshops, divisions.
The planning and economic department organizes the work and manages the preparation of materials and the necessary initial data in all departments and services of the enterprise participating in the development of the technical and industrial financial plan. He draws up plans for all shops of the main and auxiliary production and receives their reports. The department organizes the preparation and implementation of cost accounting in the divisions and workshops of the enterprise, prepares materials for the conclusion of contracts for the supply of products, exercises control and methodological guidance of the workshop planning bodies and planning divisions of other departments (design department, chief mechanic department, etc.). Finally, the PEO maintains correspondence and contacts with the planning bodies of higher organizations.
The production and dispatching department (PDO), based on the tasks of the technical industrial and financial plan, develops nomenclature, production tasks workshops and production sites(with a non-shop management structure), sets deadlines and controls the progress of these tasks.
In addition, PDO coordinates the work of all departments and services involved in providing production with everything necessary. An important task of PDO is the organization of rhythmic production and output. For this purpose, operational accounting of production is carried out, dispatcher control is organized, prompt measures are taken to eliminate emerging deviations from the plan.
The planning bodies of the shops - planning and dispatching bureaus (PDB) carry out intra-shop planning. They issue production tasks to sites for short periods of time (a month or less), provide them with materials, systematically (daily) control the progress of production, keep records and reports on the implementation of the plan.
The most important tool for improving planning in industry and in every enterprise at the present stage is the use of mathematical methods and electronic computers, creation of automated production control systems (APCS).
Speaking about the introduction of automated control systems as the most important direction for improving planning, one should not forget that automated system- this is the highest form of production management, which, however, is not a "cure for all diseases." High level planning is impossible if the issues of specialization of the enterprise's production are not resolved, there is no rational organization production and labor, or the cost accounting system is inactive.
Therefore, the improvement of planning is a complex problem that covers all aspects of the enterprise.

As in any enterprise, there is a planning and economic department, which is headed by the head of the planning and economic department, which belongs to the category of managers. A person with higher professional education and at least five years of experience in the specialty in the field of planning is appointed to the position of the planning and economic department. Appointment to the position of the head of the department is made by order of the director of the enterprise. The planning and economic department of the enterprise carries out:

Current and long-term planning of the technical and economic indicators of the enterprise and monitors the timeliness of bringing the established indicators to the shops;

Provides accounting and control over the implementation of planned targets of the enterprise and workshops;

Conducts an analysis of the results of the production activities of the enterprise and workshops;

Carries out the development and bringing to work plans for the production and quality of products;

Conducts an analysis of the technical and economic indicators of the work of shops, identifying the possibility of output, increasing productivity and education, reducing the cost of production;

Develops measures for planning reserves, organizes calculations of economic efficiency from measures for the enterprise and in general, makes calculations to determine the effectiveness of the introduction of new technology and rationalization proposals,

Ensures the preparation of periodic and daily reporting of production and economic activities and according to the forms of statistical reporting;

Makes a planned calculation of goods, products and services for the current year, broken down by quarters;

Performs calculations necessary for the preparation of current plans and applications for material resources;

Carries out bringing the norms and standards for the use of resources to the lower divisions of the enterprise and their periodic revision as technology improves and the organization of labor in production improves;

Conducts daily accounting of the implementation of technical and economic indicators for the enterprise and workshops.


A PTO engineer is a mandatory position in each. You can find it at any construction site. What is the task of such an employee and the main goals of his work, we will consider in this article.

Before considering the features of this position, consider what is meant by the abbreviation PTO. It stands for production and technical department, which should include an engineer holding this position. The department faces a number of tasks, the main of which is working with . Each of its employees has its own functions. Also, this department can be combined with the design department.

All about the PTO engineer

The construction of buildings of a different nature is a complex labor-intensive process. It is important that during its implementation all rules and regulations are observed. For this, projects are initially developed, according to which the construction of buildings is carried out in the future. The further fate of the object depends on how well the project is drawn up. It is important that the erected structure is reliable and stable in the first place, since the safety of others depends on this factor.

The development of the project is entrusted to the PTO. In order to properly perform this work, a certain level of qualification and is required.

First of all, this is the graduation from a higher educational institution in the relevant specialty and work experience of at least 3 years. But for certain objects that do not provide capital construction, the main thing that is required from the person holding this position is the ability to work with project documents, which, according to GOST, include the following:

  • drawing
  • specifications
  • specification
  • statement
  • scheme
  • methods and sequence of tests
  • calculations, which are usually carried out in the form of an estimate
  • technical instructions
  • commissioning documentation
  • repair documentation, etc.

The task of an engineer is to be able not only to draw up such papers, but also to read documents drawn up by other people. His work is based on knowledge, as well as the norms and forms of documentation established by the state.

Valuable skills for an employee

A VET engineer is not just an accountant who fills out paperwork. He must have special qualities to clearly understand and understand how the workflow is going on. It is important to take into account every little thing and control every stage of work.

It is not enough to be familiar, it is necessary to thoroughly know the norms of such acts as:

  • OT rules
  • Safety regulations
  • Labor Code of the Russian Federation

What kind of knowledge an employee needs depends on the type of activity of the company in which he is employed.

Fields of activity of a PTO engineer

According to the legislation, the production and technical department is present in most organizations.

If this position is not provided for in construction company, it will be named as the estimator. He faces the same tasks as the PTO engineer. He must monitor the implementation of design work and compliance with the instructions provided for by law. In production, the position of the estimator can be combined with the engineer. The estimator is assigned the following types of responsibility:

  • imputation of all the rights that are assigned to him by the job description
  • for the speed of completing tasks
  • progress report to management
  • violation of the time of work
  • deviation from an order
  • and other situations provided for by the instructions

Production and technical departments are usually mandatory for areas such as installation, energy, as well as industrial enterprises. Also, it is necessarily included in the housing and communal services.

The main thing that the department has to carry out is the control of all stages of the work. When it comes to housing and communal services, the goal of the department is to control the rules for the operation of property that is owned by the complex.

In the field of energy, it is especially important that the estimator knows how the power system works, what are the conditions for its operation and the main safety measures when using it.

Rights and obligations

As mentioned above, the estimator works directly at the site of the construction of the object. He has a lot of responsibilities that are not just about keeping records. It is important for him to monitor the compliance of the actual work, as well as their result with the documentation.

As part of this, it does the following:

  1. Control of budget documentation, checks compliance with planned and actual costs.
  2. Prepares additional estimates, in case of need for unforeseen work.
  3. Supervises the preparation of a report on
  4. Controls that the requirements of the customer are taken into account when performing work.
  5. Negotiate additional costs with the customer
  6. Prepares paperwork to resolve a dispute, if any, with employees.
  7. Checks the act of acceptance of the work performed by the contractor.
  8. Performs official assignments established by the company's management.
  9. Prepares and submits progress reports to management.